{"id":1743,"date":"2016-07-04T16:58:02","date_gmt":"2016-07-04T20:58:02","guid":{"rendered":"http:\/\/rv10.mirimar.org\/?p=1743"},"modified":"2017-07-05T14:25:41","modified_gmt":"2017-07-05T18:25:41","slug":"rear-wire-runs-3","status":"publish","type":"post","link":"https:\/\/rv10.mirimar.org\/?p=1743","title":{"rendered":"Rear Wire Runs (3)"},"content":{"rendered":"<p>Painting the interior last week has unlocked a number of different activities which can now be undertaken.\u00a0 The Fourth of July 2016 weekend was used for installing things which have been prepped and staged for quite a while.\u00a0 The sequence of activities was based on time of day (heat in shop), and whether solo work was possible or another set of hands was needed.<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6699.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1724 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6699-150x150.jpg\" alt=\"IMGP6699\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6699-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6699-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>A few miscellaneous parts were also painted last week.\u00a0 Here the outer baggage door panel is riveted onto the frame.\u00a0 Eric helped by driving from the exterior side, while I bucked from the inside.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6698.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1723 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6698-150x150.jpg\" alt=\"IMGP6698\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6698-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6698-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6701.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1725 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6701-150x150.jpg\" alt=\"IMGP6701\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6701-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6701-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Here are two different perspectives of the baggage door from the inside. The next step is fit 1&#8243; sound damping insulation, then pop rivet the inner panel to the frame.\u00a0 Last step will be install the door lock\/latch, but this will be after the cabin door hardware is acquired.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6703.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1727 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6703-150x150.jpg\" alt=\"IMGP6703\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6703-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6703-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Saturday morning saw foam soundproofing material installed with contact cement. Rich had cut these several months ago on a previous visit.\u00a0 The directions say let sit for 15 minutes before bonding the two surfaces, but this caused instant adhesion between the parts and some mis-aligned panels until I figured it out.\u00a0 For this foam material\/ cement combination the best approach is put a thin coat on the plane, followed quickly by the foam &#8211; then immediately fit together.\u00a0 This leaves the contact cement just a bit slippery and able to slide just a little, enough to help position the panels better.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6702.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1726 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6702-150x150.jpg\" alt=\"IMGP6702\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6702-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6702-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6705.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1728 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6705-150x150.jpg\" alt=\"IMGP6705\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6705-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6705-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Here are views for the side panels and underneath the rear floor panel. All is not pretty, but not to worry.\u00a0 All the foam installed so far is covered by another interior panel and will not be visible.\u00a0 I hope the sound-dampening effect proves worth the effort involved.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6709.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1729 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6709-150x150.jpg\" alt=\"IMGP6709\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6709-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6709-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Okay, interior painted and foam applied.\u00a0 Now fit the rear seat panels and rivet in place.\u00a0 The photo shows thin plastic cutting boards ($8 for 5 sheets from Amazon) used to protect the side wells from being scratched by the panel on insert.\u00a0 This worked great and no damage was done.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6711.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1730 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6711-150x150.jpg\" alt=\"IMGP6711\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6711-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6711-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6712.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1731 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6712-150x150.jpg\" alt=\"IMGP6712\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6712-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6712-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Floor panel is clecoed into place, then the floors pop riveted to the ribs underneath.\u00a0 I used a pneumatic riveter borrowed from Tal for the cheap ones with easy access.\u00a0 More expensive, but delightfully easy to use, CherryMAX CR3213-04-02 rivets were installed in the difficult corners with the offset head on the 704B riveter.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6718.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1732 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6718-150x150.jpg\" alt=\"IMGP6718\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6718-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6718-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6720.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1733 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6720-150x150.jpg\" alt=\"IMGP6720\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6720-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6720-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>The left picture shows the completed floor\/rib rivets, while the right picture shows the fully completed effort. The plastic cutting sheets were used to protect the floor as the side rivets were installed.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6737.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1739 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6737-150x150.jpg\" alt=\"IMGP6737\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6737-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6737-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6739.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1740 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6739-150x150.jpg\" alt=\"IMGP6739\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6739-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6739-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Floor panels complete, now cut and install MS21266 nylon edging grommet material on the bulkheads where power wires, antennas, and static tubes will be run.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6721.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1734 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6721-150x150.jpg\" alt=\"IMGP6721\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6721-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6721-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>The main event &#8211; installing the 5\/8&#8243; ID black conduit.\u00a0 The prepared holes in the seat panel are first threaded with conduit.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6726.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1735 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6726-150x150.jpg\" alt=\"IMGP6726\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6726-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6726-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6728.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1736 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6728-150x150.jpg\" alt=\"IMGP6728\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6728-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6728-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Then the conduit is run through the interior rib, and out the lightning hole under the baggage floor.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6734.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1737 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6734-150x150.jpg\" alt=\"IMGP6734\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6734-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6734-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6736.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1738 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6736-150x150.jpg\" alt=\"IMGP6736\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6736-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6736-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>The conduit is then fastened to anchor points with 0.010&#8243; fiberglass cable lace.\u00a0 Again not the prettiest outcome, but seems to hold everything together quite well.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6742.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1742 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6742-150x150.jpg\" alt=\"IMGP6742\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6742-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6742-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Using the packing peanut \/ fishing line \/ suction method, 2mm paracord is pulled through the installed conduit and tied to the bulkheads. These cords will later be used for pulling wires under the rear seat and under the baggage compartment.\u00a0 Once the seat panels are riveted in-place, no more access will be available.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6741.jpg\" data-rel=\"lightbox-gallery-eblmWAKM\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1741 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6741-150x150.jpg\" alt=\"IMGP6741\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6741-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2016\/07\/IMGP6741-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Finally for this week, I started hand riveting the side floor angles.\u00a0 Once these are done, the baggage floor can be permanently attached.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Painting the interior last week has unlocked a number of different activities which can now be undertaken.\u00a0 The Fourth of July 2016 weekend was used for installing things which have been prepped and staged for quite a while.\u00a0 The sequence of activities was based on time of day (heat in shop), and whether solo work <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/rv10.mirimar.org\/?p=1743\" class=\"more-link\"><span>Continue Reading &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,40],"tags":[],"class_list":["post-1743","post","type-post","status-publish","format-standard","hentry","category-rv-10-build-project","category-section-33-baggage-area"],"_links":{"self":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/1743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1743"}],"version-history":[{"count":7,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/1743\/revisions"}],"predecessor-version":[{"id":1750,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/1743\/revisions\/1750"}],"wp:attachment":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}