{"id":2136,"date":"2017-09-03T14:29:04","date_gmt":"2017-09-03T18:29:04","guid":{"rendered":"http:\/\/rv10.mirimar.org\/?p=2136"},"modified":"2017-09-03T19:54:46","modified_gmt":"2017-09-03T23:54:46","slug":"empennage-fairings-5","status":"publish","type":"post","link":"https:\/\/rv10.mirimar.org\/?p=2136","title":{"rendered":"Empennage Fairings (5)"},"content":{"rendered":"<p>Work on the vertical stabilizer and rudder fairings was recently completed &#8211; at least for the time being and until final preparations for paint are underway.<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7917.jpg\" data-rel=\"lightbox-gallery-o2mrkwh5\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-2129 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7917-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7917-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7917-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>My overall satisfaction level is good with the overall fit, gaps and blending of skins to fairings.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7915.jpg\" data-rel=\"lightbox-gallery-o2mrkwh5\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-2127 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7915-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7915-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7915-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7916.jpg\" data-rel=\"lightbox-gallery-o2mrkwh5\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-2128 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7916-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7916-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7916-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>The upper and lower elements are clecoed in position to check the final rudder angles, gap tolerance on the upper rudder swing and rudder\/vs skin clearance.\u00a0 All within tolerance and acceptable for now.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>The next fairings to be addressed are on the horizontal stabilizer.\u00a0 To properly fit these, Section 11 Tailcone Attach elements must first be completed.\u00a0 The elevators are fastened to the rod end bearings of the HS, then angles and clearances checked for free movement.<\/p>\n<p>adfa<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7933.jpg\" data-rel=\"lightbox-gallery-o2mrkwh5\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-2133 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7933-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7933-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7933-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7937.jpg\" data-rel=\"lightbox-gallery-o2mrkwh5\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-2139 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7937-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7937-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7937-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Here the HS cradles in the jig built many moons ago with the original construction.\u00a0 The elevators are in position to begin work on the fairing alignment.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7938.jpg\" data-rel=\"lightbox-gallery-o2mrkwh5\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-2140 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7938-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7938-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7938-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7939.jpg\" data-rel=\"lightbox-gallery-o2mrkwh5\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-2141 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7939-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7939-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7939-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Close-ups of the gap between elevator tips and horizontal stabilizer, then the rod end bearding and the hinges.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7935.jpg\" data-rel=\"lightbox-gallery-o2mrkwh5\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-2135 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7935-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7935-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7935-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7934.jpg\" data-rel=\"lightbox-gallery-o2mrkwh5\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-2134 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7934-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7934-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2017\/09\/IMGP7934-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Initial fiberglass filling of the HS end caps after rough trimming to shape with the elevator tips.\u00a0 These are not straight &#8211; bending backwards at an 8degree angle. This is enough to\u00a0 prevent the fiberglass molding from being simple.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work on the vertical stabilizer and rudder fairings was recently completed &#8211; at least for the time being and until final preparations for paint are underway. My overall satisfaction level is good with the overall fit, gaps and blending of skins to fairings. &nbsp; &nbsp; &nbsp; &nbsp; The upper and lower elements are clecoed in <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/rv10.mirimar.org\/?p=2136\" class=\"more-link\"><span>Continue Reading &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,49,47],"tags":[],"class_list":["post-2136","post","type-post","status-publish","format-standard","hentry","category-rv-10-build-project","category-section-11-empennage-attach","category-section-12-empennage-fairings"],"_links":{"self":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/2136","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2136"}],"version-history":[{"count":5,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/2136\/revisions"}],"predecessor-version":[{"id":2144,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/2136\/revisions\/2144"}],"wp:attachment":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}