{"id":2166,"date":"2020-07-25T12:44:07","date_gmt":"2020-07-25T16:44:07","guid":{"rendered":"http:\/\/rv10.mirimar.org\/?p=2166"},"modified":"2020-10-17T19:23:02","modified_gmt":"2020-10-17T23:23:02","slug":"empennage-attach-5-and-empennage-fairings-7","status":"publish","type":"post","link":"https:\/\/rv10.mirimar.org\/?p=2166","title":{"rendered":"Empennage Attach (5) and Empennage Fairings (7)"},"content":{"rendered":"<p>Attachment of the horizontal stabilizer enabled the final configuration of the elevator control rods and elevator stops.<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9297.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3051 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9297-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9297-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9297-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9302.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3052 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9302-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9302-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9302-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Match drilling the forward spar shims and aft bracket were performed to mount the horizontal stabilizer.\u00a0 The UP position of 30 degrees exactly matches specification. The DOWN angle, even after considerable filing of the stop bracket, was finalized about a degree shy of the expected 25 degrees.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9305.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3054 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9305-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9305-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9305-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9307.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3055 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9307-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9307-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9307-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>These pictures show the vertical stabilizer forward and aft attachments after the elevators were removed. Two mounting shims under each forward HS spar attach pad were also match drilled and bolted on before VS install.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9296.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3050 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9296-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9296-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9296-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9295.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3049 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9295-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9295-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMGP9295-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>The empennage gap cover under the HS was clecoed into place. The rear section overlaps the inspection port cover.\u00a0 Both are match drilled together through the longeron.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9318.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3057 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9318-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9318-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9318-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>The plans call for only three screws per side to hold the forward section of the empennage fairing.\u00a0 Many pilots have suggested additional fasteners to prevent fiberglass bulging due to air stream pressure over the fuselage. Here intermediate points were drilled midway between the default points. Nutplates for #6 screws will later be added to the upper aft skin.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9319.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3058 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9319-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9319-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9319-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9320.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3059 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9320-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9320-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9320-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Front and rear photos of the match drill screw points on the empennage fairing. The aft points require special care when trimming to not interfere with either the elevator horn or the rudder motions.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9323.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3060 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9323-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9323-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9323-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9311.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3056 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9311-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9311-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9311-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>With the main empennage components staged in place, the whole fuselage begins to look like an airplane.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>OCTOBER 2020 UPDATE<\/p>\n<p>Further trimming and edge preparation has been completed on the fiberglass empennage prior to priming.<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9351.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3109 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9351-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9351-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9351-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9352.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3110 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9352-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9352-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9352-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Edges were measured against a scribe line formed into the part. Enough &#8216;meat&#8217; needed to remain for the attachment screws to have sufficient structure to hold properly.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9354.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3111 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9354-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9354-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9354-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9363.jpg\" data-rel=\"lightbox-gallery-tIUveiNo\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3114 size-thumbnail\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9363-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9363-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/10\/IMHF9363-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Because of the extra holes added, smooth curves based on circular patterns were applied.\u00a0 Since fiberglass always seems to have numerous pinholes from the manufacturing process, a coat of Smooth Prime helps with initial underlayment.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>MISCELLANEOUS<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-3053\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9304-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9304-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2020\/07\/IMHF9304-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/>The forward and aft NACA air vents were fastened with ProSeal and #4 stainless screws into position.\u00a0 Later SuperFil will be applied to smooth out the backing plate rivets.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Attachment of the horizontal stabilizer enabled the final configuration of the elevator control rods and elevator stops. Match drilling the forward spar shims and aft bracket were performed to mount the horizontal stabilizer.\u00a0 The UP position of 30 degrees exactly matches specification. The DOWN angle, even after considerable filing of the stop bracket, was finalized <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/rv10.mirimar.org\/?p=2166\" class=\"more-link\"><span>Continue Reading &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,49,47],"tags":[],"class_list":["post-2166","post","type-post","status-publish","format-standard","hentry","category-rv-10-build-project","category-section-11-empennage-attach","category-section-12-empennage-fairings"],"_links":{"self":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/2166","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2166"}],"version-history":[{"count":9,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/2166\/revisions"}],"predecessor-version":[{"id":3168,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/2166\/revisions\/3168"}],"wp:attachment":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2166"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2166"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}