{"id":426,"date":"2013-12-23T17:48:40","date_gmt":"2013-12-23T22:48:40","guid":{"rendered":"http:\/\/rv10.mirimar.org\/?p=426"},"modified":"2013-12-23T17:48:40","modified_gmt":"2013-12-23T22:48:40","slug":"dunk-tank","status":"publish","type":"post","link":"https:\/\/rv10.mirimar.org\/?p=426","title":{"rendered":"Dunk Tank"},"content":{"rendered":"<p>The first section of the dunk tank for alodine and aluminum prep, DX503 and DX533 respectively, was completed today. It is make from three 8&#8242; long 2&#215;4 studs with a 1\/4&#8243; plywood bottom. This will be lined with 4-5mil plastic on each side, then filled with about 3 gallons of material. Drain holes at this end of the tanks will funnel material back into 5 gallon sealable buckets when each cycle is done.<\/p>\n<p>The length of the tank is adjustable using 6&#8243; 2&#215;4 pieces. This 8&#8242; section can be used for almost all empennage parts, the exceptions being the eleven foot spars for the horizontal stabilizer. For these another section about 5&#8242; long will be made, then bolted to the end of this tank.\u00a0 Two smaller tanks in this configuration will be easier to manipulate than on huge 12&#8242; tank.\u00a0 The backs of both tanks can also serve as painting surfaces when they are not in use otherwise.<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2013\/12\/IMGP3612.jpg\" data-rel=\"lightbox-gallery-qhKLeH7a\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-423\" alt=\"IMGP3612\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2013\/12\/IMGP3612-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2013\/12\/IMGP3612-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2013\/12\/IMGP3612-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first section of the dunk tank for alodine and aluminum prep, DX503 and DX533 respectively, was completed today. It is make from three 8&#8242; long 2&#215;4 studs with a 1\/4&#8243; plywood bottom. This will be lined with 4-5mil plastic on each side, then filled with about 3 gallons of material. Drain holes at this <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/rv10.mirimar.org\/?p=426\" class=\"more-link\"><span>Continue Reading &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-426","post","type-post","status-publish","format-standard","hentry","category-logistics"],"_links":{"self":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=426"}],"version-history":[{"count":1,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/426\/revisions"}],"predecessor-version":[{"id":427,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/426\/revisions\/427"}],"wp:attachment":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}