{"id":649,"date":"2014-03-11T05:54:52","date_gmt":"2014-03-11T09:54:52","guid":{"rendered":"http:\/\/rv10.mirimar.org\/?p=649"},"modified":"2014-03-11T05:54:52","modified_gmt":"2014-03-11T09:54:52","slug":"first-contact","status":"publish","type":"post","link":"https:\/\/rv10.mirimar.org\/?p=649","title":{"rendered":"First Contact"},"content":{"rendered":"<p>Another power weekend finally saw the first parts riveted together!<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3927.jpg\" data-rel=\"lightbox-gallery-ClLMUHdl\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-642\" alt=\"IMGP3927\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3927-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3927-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3927-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>On Saturday Rich helped me apply PreKote to the skins with a light scuffing with grey Scotchbrite.\u00a0 The process is simple &#8211; apply, scrub, rinse thoroughly, hang to dry.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3965.jpg\" data-rel=\"lightbox-gallery-ClLMUHdl\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-643\" alt=\"IMGP3965\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3965-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3965-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3965-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>The treated rudder skins are hanging from the dryer racks in the shed.\u00a0 The were left overnight to dry with a space heater and a 1000watt floodlight on to combat the near freezing temperatures.\u00a0 With all the devices running, the shed maintained a comfy 23 degree Celsius.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3967.jpg\" data-rel=\"lightbox-gallery-ClLMUHdl\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-644\" alt=\"IMGP3967\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3967-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3967-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3967-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>On Sunday after lunch I got suited up and ready to spray.\u00a0 Each time the process of preparation gets a bit smoother.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3968.jpg\" data-rel=\"lightbox-gallery-ClLMUHdl\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-645\" alt=\"IMGP3968\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3968-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3968-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3968-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Back in the bonus room with my first two parts to rivet in hand.\u00a0 Because these were not part of the Van&#8217;s build plans, I started with my custom-made doubler for the upper VS rib. Note all the primed VS and rudder parts on the drying racks in the background.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3970.jpg\" data-rel=\"lightbox-gallery-ClLMUHdl\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-646\" alt=\"IMGP3970\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3970-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3970-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3970-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>First contact! but also brought first mistakes.\u00a0 The first set of squeezed rivets went so well, I overzealously put a rivet in the lower right drilled hole.\u00a0 The three in this row are supposed to attach to the forward VS spar.\u00a0 Okay, so used the rivet removal tool for extraction.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3972.jpg\" data-rel=\"lightbox-gallery-ClLMUHdl\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-648\" alt=\"IMGP3972\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3972-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3972-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3972-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Just to prove I can make more mistakes, here is a closeup of the final rib combination. Close examination shows the forward nut plate rivets are slightly bent inward.\u00a0 I was using the Main Squeeze tool properly, but with driving bits too short.\u00a0 This caused the C-yoke to contact the nut body at the end of the squeeze, forcing the small angle on the rivet.\u00a0 By using taller driving bits on the second nut plate, I got full clearance on the nut body &#8211; thus no contact, no angle and a resulting smooth surface.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3971.jpg\" data-rel=\"lightbox-gallery-ClLMUHdl\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-647\" alt=\"IMGP3971\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3971-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3971-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/03\/IMGP3971-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Had only the nut plate been slightly bent, I would have drilled out and replaced it.\u00a0 However, the doubler was also impacted and further rework would probably have done more harm than good.\u00a0 This is one of those occasions where the outcome is fully functional, but not esthetically perfect in the eyes of the builder.<\/p>\n<p>Overall this was a great learning experience, and hopefully the beginning of a constantly improving build process.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Another power weekend finally saw the first parts riveted together! On Saturday Rich helped me apply PreKote to the skins with a light scuffing with grey Scotchbrite.\u00a0 The process is simple &#8211; apply, scrub, rinse thoroughly, hang to dry. &nbsp; &nbsp; &nbsp; &nbsp; The treated rudder skins are hanging from the dryer racks in the <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/rv10.mirimar.org\/?p=649\" class=\"more-link\"><span>Continue Reading &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,9,21],"tags":[],"class_list":["post-649","post","type-post","status-publish","format-standard","hentry","category-rv-10-build-project","category-section-6-vertical-stabilizer","category-section-7-rudder"],"_links":{"self":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=649"}],"version-history":[{"count":1,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/649\/revisions"}],"predecessor-version":[{"id":652,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/649\/revisions\/652"}],"wp:attachment":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=649"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=649"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}