{"id":744,"date":"2014-04-20T09:19:52","date_gmt":"2014-04-20T13:19:52","guid":{"rendered":"http:\/\/rv10.mirimar.org\/?p=744"},"modified":"2014-04-20T09:25:30","modified_gmt":"2014-04-20T13:25:30","slug":"hs-drilling","status":"publish","type":"post","link":"https:\/\/rv10.mirimar.org\/?p=744","title":{"rendered":"HS Drilling"},"content":{"rendered":"<p>Much of the metal preparation work on the horizontal stabilizer was done before I primed and assembled the rudder and VS.\u00a0 This weekend saw the start of jigging and match drilling on the rear spar of the HS.<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4117.jpg\" data-rel=\"lightbox-gallery-0dEVIzlw\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-736\" alt=\"IMGP4117\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4117-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4117-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4117-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>As usual, all the parts are laid out and checked before any alterations are started.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4124.jpg\" data-rel=\"lightbox-gallery-0dEVIzlw\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-738\" alt=\"IMGP4124\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4124-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4124-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4124-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>An initial task is riveting a flange bearing between two powder coated pieces to construct the inboard hinge brackets.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4125.jpg\" data-rel=\"lightbox-gallery-0dEVIzlw\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-739\" alt=\"IMGP4125\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4125-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4125-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4125-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Looks just right.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4126.jpg\" data-rel=\"lightbox-gallery-0dEVIzlw\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-740\" alt=\"IMGP4126\" src=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4126-150x150.jpg\" width=\"150\" height=\"150\" srcset=\"https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4126-150x150.jpg 150w, https:\/\/rv10.mirimar.org\/wp-content\/uploads\/2014\/04\/IMGP4126-200x200.jpg 200w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>Match drilling the hinge brackets and the rear spar doubler is the first order of business.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Much of the metal preparation work on the horizontal stabilizer was done before I primed and assembled the rudder and VS.\u00a0 This weekend saw the start of jigging and match drilling on the rear spar of the HS. As usual, all the parts are laid out and checked before any alterations are started. &nbsp; &nbsp; <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/rv10.mirimar.org\/?p=744\" class=\"more-link\"><span>Continue Reading &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,26],"tags":[],"class_list":["post-744","post","type-post","status-publish","format-standard","hentry","category-rv-10-build-project","category-section-8-horizontal-stabilizer"],"_links":{"self":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=744"}],"version-history":[{"count":4,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/744\/revisions"}],"predecessor-version":[{"id":749,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=\/wp\/v2\/posts\/744\/revisions\/749"}],"wp:attachment":[{"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rv10.mirimar.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}