Category Archives: New Home

New Home (8)

After months of packing, boxing, sanding, painting, moving… the old house is finally sold, and we closed on the new house.  This means get the electrical work done in the basement by a very skilled professional. Eight 20amp circuits were installed, should be enough to power the shop with no problems.  Next was network media closet and low voltage runs of CAT6+ cable.  About this same time Michael came to visit. Coincidentally I had lens replacement surgery in my right eye. Under doctors instruction I was not allowed to do anything for a few weeks.

 

Michael did the majority of the low-voltage work.  These photos show him terminating ethernet cables at the media closet and in the field.

 

 

Not quite finished, but way better than the mess left by the builder.

 

 

 

Plastic serves as a temporary wall between the shop area and the office.  I may consider later this year I putting up drywall and finishing the right side of the basement. Back to plane building first!

 

New Home (6)

Not much happened over the Christmas holidays, but plenty of action since the New Year.  Biggest item is a second HVAC unit for the second floor and revamped ducting in the basement to allow 9′ ceiling in most locations.  Not optimal, but way better than before.  They also finished the back deck, insulated around exterior walls, and mostly completed drywall rough-ins.  Current schedule is house completion in early April.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Home (5)

Electrical and HVAC installations continued over the weekend.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Notice on these next pictures how the engineered floor joists have been completely cut through the web to accommodate the AC ducting.  I do not think this is correct and will be taking up the matter with both the builder and the city inspector’s office.

 

New Home (4)

Updates from December 9 week.

 

 

 

 

 

 

 

 

 

 

New Home (3)

Here is progress as of November 24 (Thanksgiving Day)

imgp7228imgp7242imgp7231

 

 

 

 

 

imgp7241imgp7233imgp7236

 

 

 

 

 

imgp7237imgp7253imgp7244

 

 

 

 

 

imgp7245imgp7246imgp7247

 

 

 

 

imgp7251

 

 

 

 

 

 

New Home (2)

Here is the basement rough-in from November 18.

imgp7161imgp7162imgp7163

 

 

 

 

 

imgp7167imgp7168imgp7173

 

 

 

 

 

imgp7177imgp7179imgp7188

New Home

The construction of airplane parts will be taking a back seat to new home construction.  One benefit of the new domicile will be a 25′ x 30′ heated/cooled basement workspace.  Excellent!

All the initial paperwork has been completed. Now the build is underway.  My direct involvement will not occur for another few months.

imgp7069imgp7072imgp7073

 

 

 

 

 

imgp7074imgp7078imgp7077

 

 

 

 

 

imgp7086imgp7088imgp7091

 

 

 

 

 

imgp7092imgp7087imgp7092

 

 

 

 

 

imgp7126imgp7123imgp7122

 

 

 

 

 

imgp7132imgp7130imgp7138

 

 

 

 

 

imgp7133imgp7137imgp7160

 

 

 

 

 

imgp7158