Category Archives: Rv-10 Build Project

Brake Lines and Misc (1)

After many moons of working on body, panel and fiberglass parts, I can now start installation of mechanical components.  First up are the firewall insulation and brake line fabrication.

As usual the brake parts are laid out prior to installation.  Here the standard Matco brake cylinders which come with the Vans kit are supplemented with 3/8″ ID springs and Climax C-037-A aluminum set screw collars.  The springs assist with brake pedal rebound and provide better control during braking.  Since the spring tension is adjustable via the collar, the final alignment can be fixed per desire after some braking tests.

 

The Vans brake plumbing will be augmented with a Matco park valve from the AirWard kit.  The final angles on the AN fittings will be selected for best alignment after the lines are bent.

 

 

 

The firewall on the quick build fuselage comes with the Vans brake line attachment already riveted in place.  This was removed to accommodate the base plate from the AirWard kit.

 

 

 

Since the interior side of firewall will also be covered with Rattle Trap sound dampening and heat reflective material, templates for the insulation material were measured and cut.

 

 

Hard 1/4″ aluminum tubing was selected for the brake line material.  Coat hangers were bent into templates for the under-seat hard lines.  Then the tubes were bent to fit.  Here are the first two examples prior to flanging.  The next steps will be the tunnel lines and connection to the parking brake valves.

 

 

 

GLARE SHIELD

The grab handles on the quick-build glare shield are very flimsy.  Since those holds are intended for passenger entry/egress, I feel some reinforcement is necessary.  Here the holes are measured and cut in a spare piece of fiberglass to add stiffness.

 

 

The final attachment of the reinforcement plate will be with rivets, then covered with 1/8″ closed foam padding bonded together with a covering material for anti-glare purposes.  Most likely this material will be grey trunk liner – thin, strong, and non-reflective.

 

 

 

INTERIOR PAINT

The front seat area paint of the cockpit was fine, but additional work was needed on the back seat/baggage area.  This was mostly due to perspiration drops on some flat areas from the previous work.  I wound up sweating at the end of the original paint session due to the high outside temperature.

 

These cosmetic issues have waited until now for resolution.  Now all the interior paint looks good, including the sills which were not part of the original paint session.

 

 

 

CABLE RUNS / BATTERY PLATFORM

With the time for pulling electrical wires fast approaching, attention is required for the previously installed nylon conduits.  Trimming back the excess length was performed.  Also done was the rivet installation of the secondary battery platform support bracket.

 

 

 

Cowl Fitting

This week started the fitting of cowls together.  Supplemental elements were fabricated which will later provide rigidity when splitting the lower cowl into two sections.  Two lower halves will greatly facilitate the cowl removal after a three bladed propeller is installed.

First measure and trim the lower cowl such that the height from center is 1/2 the diameter, and that the inlets are equally spaced above the centerline.  In retrospect I should have measured from the inner ring instead of the forward surface as shown.

 

The  primary stiffness for holding the two halves together will come from an .063″ aluminum plate fabricated while the cowl is still in one piece.  This was sandwiched with a layer of West Marine resin to ensure a tight fit without any gaps.

 

 

The jig in the right photo was used to scribe a consistent line on the outer cowl surface. Pilot holes of #40 size were then drilled through the cowl and the stiffener bracket.

 

 

 

These photos show the drilled bracket from two angles.  The additional fiberglass piece in the left photo will provide overlap (without fasteners) for overlap at the split location.

 

 

 

Air inlet ramps were the positioned and drilled into the upper cowl.

Oil Door and Misc (2)

This week a stainless strike plate for the oil door camlock latches was fabricated, as well as a backing plate for the Cleaveland Tool hidden hinge.

These  photos show the application of West Marine resin / colloidal silica mixture to the upper cowl in preparation for riveting the hinges and oil door in-place.

 

 

 

Backing plates for the oil door hinges and the latches were also fabricated from .032″ aluminum pieces.  The plates were bonded to the fiberglass substrate with resin adhesive, followed by cleces in place during the curing process.  The whole door was then sprayed with heat resistant aluminum paint.  Finally all the parts were fastened together with AN426A (soft) rivets.

 

Here the oil door is dry fit in cowl opening.

 

 

 

 

SuperFil was applied to even the profile differences between the cowl and the door itself.  After this dries, all parts will be sanded smooth and prepared for further process of cowl fitting.

 

 

Here is the interim result ready for prime/paint.  Note the push buttons are slightly recessed.  Depending on the final paint job, I may address making these more flush with the surface.

 

Oil Door and Misc (1)

The oil door on the upper cowling will be modified from the original vans plans to accommodate a hidden hinge and camlock latches.  Also work on miscellaneous components of for the cockpit were started.

The first step was trim the fiberglass door part to fit snugly into the preformed pocket on the upper cowling piece.  This involved initial shaping with a Dremel cutting wheel, followed by hand sanding.  As with all the fiberglass work done so far, the default fits were just approximations – nothing was square, smooth or level.  While I tried to get the door as square as possible, a bit of distortion remained.

 

 

Next was measure the inner opening to the engine compartment.  I wanted the cut line as thin as possible, so the removed piece could be used to reinforce the outer door itself.  At left are the trim lines, at right are the first cuts with the Dremel tool.

 

 

 

After the inner cuts, the hidden hinge was aligned and drilled. The initial fit was good.  Note the pink inner piece attached to the door.

 

 

 

The trickiest part of this build was aligning the camlock latches to get proper clearance with the cowling, while still being tight enough to firmly fasten the door when closed.  The left photo shows a backing plate made to strengthen the door from pressure applied by the latch spring.  At right is an outer view of the finished latches.

 

 

Two more views of the camlock latches.  Next to complete is a steel strike plate at the latch lever locations to keep the fiberglass rim from cracking or splitting.

 

 

 

 

INSTRUMENT PANEL

Holding the upper dashboard while fitting the instrument panel and electrical system can be a problem.  A jig to hold the panel in either vertical or horizontal position was created.

 

 

 

Here is the finished jig ready for work on the panel.

 

 

 

 

DASHBOARD GLARE SHIELD

A template for the upper dashboard area was created on a sheet of construction paper.  This was then covered in wax paper (for release purposes) and covered with West Marine resin and two layers of fiberglass.

 

 

 

After the template has set for a few hours, but definitely before the resin hardens completely, the sheet was placed on the dashboard and sheet pressed into shape to match the curve.  Later the hardened sheet will be covered with trunk liner to provide an anti-reflective surface.   More on that in later posts.

Wing Tips (3), Pitot System

The 2019 holidays saw plenty of shop time for plane work with continuation of a variety of wing preparations.

PITOT SYSTEM

The pitot and angle of attack (AOA) aluminum tubes near the wing root were flared to accept unions-to-plastic-tube conversions.  Note the 37 degree angle and coupler nut are dry fit, no need for lubrication on these pneumatic AN fittings.

 

 

 

The pitot mast attachment bracket (fabricated in previous posts) was riveted onto the second to last wing rib.  The pitot probe tubes were then bent to about a 90 degree angle.

 

 

 

The aluminum tubes at this end of the wing were also flanged using a Parker Rolo-Flair tool.  The red and blue markings are colored Rescue Tape.  Blue for the pitot line, red for the AOA tube.

 

 

 

The flanged tubes were then arced backwards with an Imperial 368-FH bending tool. This configuration now allows connection of the pitot lines through the wing ends.  After the skin is permanently riveted the access will be limited.

 

 

 

Once the pitot tubes were finished, then the nylon wiring conduit was cable-laced into position.  A few custom jigs were made to hold the J-channel stiffener in perfect alignment with the wing ribs.  This stabilized the rib orientations while the conduit was laced.

 

 

 

WING TIPS

To finalize the wing tip geometry the flaps and ailerons were attached and placed in the “neutral position”. This is establish using a combination of the Aileron Bellcrank jig and moving the flaps to the upper, hard stop position against the rear spar. The final angle was adjusted to 3 degrees with a few thin shims. The red Gust Lock in the photo holds the flaps/ailerons together at the same angle.

 

 

Here are the before and after pictures of the final wing tip alignment.  The steps described below were needed to make the corrections.

 

 

 

First the rear edge of the wing tip was separated with a saw. This allowed the end panels to slide against one another.  The wing rib holes were drilled to even spaces.  The split wing tip was then attached to the wing, and the wing rib progressively clecoed from the front edge toward the rear.  Colloidal silica resin, a straightedge and spring clamps were used to align the rear edge with the neutralized flap/ailerons.

 

 

The final edge was allowed to cure for 48 hours. Then the overage from the wing tips measured.  Eventually this extra material was removed (more on this in a later post).  The overall outcome was very satisfactory.

 

 

 

Another addition to the wing tips was a stiffener rib.  This helps prevent “oil canning” in flight due to air pressure on the wing tip surfaces.

 

 

 

 

WING SKINS

With the wing tips nearing completion and all the other mechanical elements in place, time to start riveting the lower skins.  This was a time consuming, two person effort. The right wing took about 10 hours to finish. We are just starting on the left wing now.

 

 

Electric Aileron Trim

The aileron push rods must first be set into a ‘neutral’ position before the trim servo motor can be properly aligned and measured. The objective of this exercise was attach the aileron trim spring brackets.

The left picture shows attaching the aileron push rod end to the outboard pivot actuator.  The inner push rod end connects to the aft arm of the aileron torque tube in the wing root.  A bearing for the torque tube must first be installed in the tank spar.

 

 

The sealed tanks (see below) were then installed in the wings – capturing both ends of the torque tubes during the fitting process. These tubes could be installed with the tanks already attached, but the process was much easier with the tanks off.

 

 

Here are close-ups of the torque tube connections in the left wing.  Notice the jig in the left photo created to position the push rod.  The final push rod end lengths were adjusted to neutral with the jigs, then the jam nuts were tightening to hold everything firm.

 

 

Now began fabrication of the trim servo bracket.  After cutting, smoothing, and deburring  the trim bracket was provisionally assembled with clecoes. The inner left inspection plate was then match drilled as the base for the trim bracket.  A coat of SEM Self-Etching primer was applied to all surfaces.

 

 

Top and bottom views of the assembled trim servo in the bracket and the modified inspection plate.

 

 

 

 

The supplied Ray-Allen trim switch was connected between a 9V battery and the servo motor.  A Fluke voltmeter confirmed electrical contact during operation.  The motor takes ~27 seconds to move from the inner to the outer position.  This measurement and actually marking the two position limits were used to locate the center of travel for the aileron trim arm.  This measurement was transferred to the neutralized push rod via a parallel angle channel and a square.

 

The photo on the left shows prior to riveting, and on the right the final configuration.  It will be a challenge to install the springs once the push rod is permanently installed in the wing.

 

 

 

 

FUEL TANKS

=============

The quick build fuel tanks were removed for leak testing prior to aileron push rod adjustment.  My A+P friend Terry filled each tank with 30 gallons of aviation fuel for a week.  No leaks!   Once final wing assembly is complete, removing the tanks for leak correction would be very difficult. So just for good measure, all the rivets and seams on the spar side were also covered with a generous portion of Van’s tank sealant (similar to ProSeal).

Bottom Wing Skins (2)

A series of miscellaneous activities were performed on the wings in the last few weeks.  This work was staged before any final riveting the bottom skins, as access is so much easier with the skins still off.

The quickbuild wings come with a main wiring channel in each wing. These roughly 5/8″ diameter hole have nylon inserts and are intended by Vans for the wingtip wire bundles.  Because of added electronics for heated pitot, aileron trim, autopilot servo, and the like, I wanted addition channels (thus the custom wire brackets from previous posts).  I also wanted dedicated grounding lines to the wingtips, so additional channels were created.  Here a template is used for reproducing the hole placement in the wing ribs.

 

 

Once measured, the 7/16″ holes are punched and then drilled with an angle head holding threaded bits.

 

 

 

The final configuration of each wing has three available channels, two through the ribs and one wiring chase attached to the custom brackets.  For the left wing, the 1/4″ soft aluminum tubes for the pitot and angle-of-attack (AOA) indicator will be fed through the larger of the runs through the ribs.

 

 

 

==================

PITOT MAST

A Gretz mount for a Garmin heated pitot needed to be crafted in the second from tip rib bay.  This location is further outboard from the Vans plans, but allows greater access for maintenance and adjusted once the bottom skin is attached.  On the left a backing plate is clecoed in place to mark the skin for a through-hole.

 

 

A sheet metal bending brake formed another  bracket for between the rib and the pitot mast backing plate.  The right photo shows the bracket clamped prior to drilling through the rib.

 

 

 

Here the #8 screw nut plates are attached to the pitot mast.

 

 

 

 

Two different views of the pitot mast – clecoed in the final position and showing in relation to the modified skin.

 

 

 

 

===========

MISCELLANOUS ACTIONS

Rich visited for two weeks to help with flap gap riveting, inspection port assembly and other miscellaneous activities.  We used CherryMax rivets of type CR3212-4-6 countersunk (qty. 6), and CR3213-4-2 (qty. 14) and CR3213-4-3 (qty. 6) round head rivets on the inner flap gap openings of each wing.

 

 

 

The wing bottoms were treated with SEM Self-etch primer from a rattle can prior to having the inspection port nut plates attached.

 

 

 

===========

AILERON ACTUATION

To properly locate the spring attachment points on the aileron push rods, the actuation levers and torque tubes must be installed and the rod oriented in a neutral position. More on that in  later posts.

Custom Wire Brackets

The default wire channels from Vans do not include provisions for additional devices I will be installing in the plane (auto pilot servos, heated pitot mast,  aileron trim servo, dedicated grounding wires, …).  In addition a nylon conduit would allow easier future maintenance than the holes through the ribs.

A series of custom wire brackets were fabricated from 1/16″x 1″ x 1.25″ angle aluminum. The band saw fence was setup to cut raw brackets the same width.

 

 

 

 

Here they are, one for each wing rib to span.

 

 

 

 

Next use a jig on the drill press to accurately reproduce the hole pattern for each bracket.

 

 

 

 

Cut, drilled, prepped, primed, and ready to assemble.  The 5/8″ nylon conduit will later be cable laced to the holders.  Zip ties could be used, but I prefer the endurance and flexibility of the cable lace.

 

 

 

Here is a through shot of the conduit run laid out with string. Then installation begins…

 

 

 

 

As with many of these operations on the wing, having the bottom skin still off makes everything so much easier.

Wing Tips (2)

This is placeholder text for details to be added later.

aaa

 

 

 

 

aaa

 

 

 

 

aaa

 

 

 

 

aaa

 

 

 

 

aaa

 

 

 

 

Here the fuel tanks are being removed from the quick built wings. The next step is leak test them with real aviation fuel, reseal as needed before installing back on the wings.

Wing Tips (1)

Once the bottom skins are ready for installation, work can begin on the wing tips.

The wing tip edges must be shortened to fit into the roughly 3/16″ (10mm) gap between the last wing rib and the skin edge.

 

 

 

After initial trimming for fit, the wing tip is #40 match drilled with the top and bottom skins.  Start at the forward portion of the wing and work backward (up in the photos).

 

 

Other builders highly advise reinforcing the very thin fiberglass web in the wing tips to prevent ‘oil canning’ both during flight and on the ground (spectators leaning on your wing).  This shows a provisional fit of 1″ rigid foam, which eventually will be glassed into place mid-section of the wing tip.

 

 

While the wing tips at this point are far from completion, having them provisionally hung on the wings is a great feeling.  The wing components are starting to look like an actual part of the aircraft.