After the gear weldment installation, the plane was reassembled basically in reverse order. During this period, elements needed for the annual condition inspection were also performed.
Installation of gear legs, brake pad replacement, and wheel attachment.
This photo shows us using a long brass rod to drive wing bolt insertion when attaching the wings. This was probably the most difficult part of the closure process.

Views of the wing bolt installation…

My previous paint job had left some parts of the wing under the fairings without paint covering. The opportunity was used to rectify this situation.