VS Metal Prep & Logisitics

Spent time this week preparing for the big two week building push expected during Rich’s visit in early March.  I fabricated a pair of drying racks from 1×1″ pine boards using medium eyelets to hold hooks made from 14/3 electrical wire. This combination was cheap and seems to work fine.  Also scuffed the non-skin components of the VS and rudder.

IMGP3853Here all the parts are staged prior to scuffing.

 

 

 

 

IMGP3854Used the spare bathroom and a doggie shower attachment to scuff with maroon Scotchbrite and green Dawn dish washing soap.  This action also took off the major grease and grime from earlier processing steps.  This is a porcelain tub, so a rubber bath mat cushions the parts in this picture.

 

 

 

IMGP3856All the parts are scuffed, cleaned and are hanging on the new drying racks.

 

 

 

 

IMGP3860I manufactured a fake window box for the dual fan setup in a few hours with cheap 2×6 pine boards. The fan is supposed to move 1420 cfm, the whole shed is 800 cubic feet.  If all goes as planned, a complete air turnover will happen twice a minute – not bad for a home paint booth.

Leave a Reply

Post Navigation