Step/Antenna Inspection Ports (3)

This weekend was about prime and rivet the inspection backers to baggage floor, then position and drill for the antenna plates for the right side installation.

IMGP6226IMGP6228IMGP6234

Add nutplates and prime with SEM aerosol can.

 

 

 

IMGP6239IMGP6241Top and bottom sides after completion of riveting.

 

 

 

 

IMGP6242This angle in this photo shows the 9/16″ hole drilled through the baggage floor to allow later access to the step bolt.

 

 

 

 

IMGP6243IMGP6244Two photos of the inspection plate in position.

 

 

 

 

IMGP6249IMGP6252Antenna plate for ADSB receiver drilled and clecoed in place.

 

 

 

 

IMGP6253This angle shows the antenna backer access. Getting to the coax connector and the two hold-down nuts for the antenna itself should be straightforward with this configuration.

 

Leave a Reply

Post Navigation