VS Metalwork Complete

 

This week all the preparation metal work leading up to alodine processing has been completed. This means corrosion prep, priming, and final assembly with riveting remain, but at least all the fitting, match drilling, deburring, dimpling and countersinking operations are done.  From the build plans Sections 6-1 through 6-4.5 have been signed off.