Finished separating the ribs parts with associated deburring from steps 7.2.1 and 7.2.2. Also ordered inital round of attachment hardware for the bonding straps and static wicks to be used on the vertical stabilizer and rudder.
MISC – Peter helped move the first dunk tank section out to the shed, plus added bracing to work surface legs. The premium buckets which will hold the alodine and brightener chemicals also came in yesterday. These were relocated out to the shed this afternoon.